Project Description

Budget: $8,800,000

Client: Sarasota County School Board

This is an on-going phased replacement project for the school’s airside and chilled waterside of the HVAC system in twelve buildings on campus. The Jon F. Swift team is installing two new air-cooled chillers, new ice storage tanks, and replacing piping and pumps in the pump room. While replacing HVAC duct work in the classrooms, new mechanical mezzanines will be installed for the new air handling equipment. After the mezzanines are installed there will be new acoustical ceilings, new light fixtures and new floor coverings installed along with a fresh coat of paint in all affected rooms.